PESO & CIMFR Certified Industrial Hooters — Made in India · Call +91 89895 67878
Home All Products Industrial Hooter EOT Crane Hooter Panel Hooter / Buzzer Conveyor Pre-Start Flameproof Hooter Audio Visual Alarms About Contact WhatsApp Quote

A conveyor belt that starts without warning is one of the most common sources of serious injury in Indian factories and mines. Workers clearing a blockage near the tail drum, walking across a transfer point, or adjusting a tracking roller can be caught by a belt that starts without notice. The Mines Act 1952 makes pre-start warning mandatory for conveyors in mining operations. Most state factory rules extend this requirement to manufacturing facilities.

Mandatory — Not Optional

Under the Mines Act 1952 and Coal Mines Regulations, no belt conveyor shall be started until an audible pre-start warning has sounded for a sufficient period to allow all persons to move clear. Most state factory rules and internal HSE standards extend this to 30 seconds minimum. The warning must be interlocked with the motor start circuit — the motor must not be able to start until the warning sequence has completed.

Pre-Start Warning Sequence

Conveyor Pre-Start Sequence — Standard Configuration
1
T − 30 seconds
First Announcement
"Savdhan! Belt conveyor 30 second mein shuru hogi. Kripya door rahein."
Warning: Belt conveyor starting in 30 seconds. Please stand clear. Plays at full volume along entire conveyor length.
2
T − 10 seconds
Final Warning
"Savdhan! Belt conveyor ab shuru hone wali hai."
Warning: Belt conveyor starting now. Last chance to clear. Motor start interlock still held.
3
T − 0
Motor Start Released
MT-PSH relay output closes → motor starter circuit energises
Interlock releases automatically after message sequence completes. No manual action required. Fully automatic.

Multi-Point Installation for Long Conveyors

A single hooter at the head end is insufficient for conveyors longer than 50m. Workers at the tail drum or intermediate transfer points may not hear a single-point warning clearly. For conveyors over 50m, install MT-PSH units at the head end, tail end, and any transfer station — all triggered simultaneously from the same PLC output. The 30-second sequence plays at all points before any motor is permitted to start.

ParameterSpecification
Pre-warning duration30 seconds (configurable 10–60 seconds)
Motor interlockRelay output on message completion — N.O. contact rated 5A 230V AC
Output110–120 dB at 1m (horn speaker directed along conveyor run)
Trigger inputDry contact from PLC DO or start pushbutton
Power supply230V AC standard; 24V DC on request
Message languageHindi + regional language (bilingual, sequential). Custom messages included.
EnclosureIP55, suitable for outdoor conveyor gallery mounting
ComplianceMines Act 1952, Coal Mines Regulations, state factory rules

Need This Hooter?

Tell us your application, ambient noise level, coverage distance, and PLC brand. We'll respond within one working day with the right model and price.

Related Products

Product
EOT Crane Hooter — Voice Pre-Start Warning for Crane Bays
Product
Flameproof Hooter — For Conveyor Galleries in Hazardous Areas
Guide
EOT Crane Safety: Complete Hooter & Pre-Start Warning Guide